Ligne
  • Diagnosis

    Production

    • Welding management diagnosis at G2 HYDRO-QUÉBEC
    • Study the potential for efficiency in central decontamination HYDRO-QUÉBEC
    • Diagnosis of warehouse operations and optimization of operations KRUGER

    Maintenance

    • Analysis and improvement of heavy equipement maintenance QIT
    • Maintenance management system analysis NORSK-HYDRO
    • Diagnostic efficiency of the maintenance of thermal power plant Tracy HYDRO-QUÉBEC
    • Analysis and improvement of organizational effectiveness to achieve the required maintenance for an optimal HYDRO-QUÉBEC
    • Diagnosis in the maintenance department at the steel plant MITTAL

    Supervision

    • Issues analysis for N5 supervisors and action plan at G2 HYDRO-QUÉBEC

    Logistics

    • Diagnosis of the yard and packaging operations of ATVs to link operations with those of Mexico BOMBARDIER PRODUITS RÉCRÉATIFS
    • Diagnosis of operations of the distribution center level inventory management and distribution. ROLAND BOULANGER
  • Lean manufacturing

    Reorganizing work methods

    • Service and administrative work station ergonomic analysis QIT
    • Work methods improvements XSTRATTA (FONDERIE HORNE)
    • Opportunity identification in maintenance optimization NORSK-HYDRO
    • Reorganization of the process of management of lockers to G2 HYDRO-QUÉBEC
    • Review and standardization of work methods at the smelting plant (almost 500 people) ALCOA
    • Start-up optimization of a Properzi wire drawing machine ALCOA
    • Organization of supervisory work ALCOA
    • Rationalization of operations at the Baie-Comeau plant and implementation of recommandations ($1.7 M project yielding $35 M in yearly savings) ALCOA
    • Improved paper machine operations #5, #3 and #4 KRUGER
    • Optimizing the efficiency of packaging lines BRASSERIE LABATT
    • Diagnosis maintenance and implementation of a system of maintenance management EXCELDOR
    • Analysis and organization of work methods at the smelting plant ABI

    Value chain optimization

    • UGS process optimization QIT
    • Supply process reorganization at G2 external store HYDRO-QUÉBEC
    • Diagnosis of Supply Support Service (SSS) at G2 HYDRO-QUÉBEC (9)
    • Support to implement Supply Technical Service (STS) at G2 HYDRO-QUÉBEC
    • Analysis and improvement of organizational effectiveness to achieve the required maintenance for an optimal HYDRO-QUÉBEC

    Operation simulation

    Plant layout

    "5S"

    • « 5S » implementation on the packing lines A and B at the smelting plant NORSK-HYDRO
    • Implantation 5S and SMED oven EBT ($ 18,000,000 additional annual capacity) MITTAL
    • 5S units 211, 212, 213 and 285 KRUGER

    SMED

    • Optimization of rebuilding time for wagons and foundry ladles QIT
    • Blast operation analysis in production increasement IRON ORE
    • Manpower tracking system IRON ORE
    • SMED AG mill IRON ORE
    • Implantation 5S and SMED oven EBT ($ 18,000,000 additional annual capacity) MITTAL
    • SMED & Ishikawa analysis to continuous casting MITTAL
    • Reduced time to start the 285th KRUGER
    • Optimization of brewing beer Budweiser BRASSERIE LABATT

    OEE-Overall equipment effectiveness

    • To come...

    Evaluatiing work loards

    • Time study of boat loading and unloading QIT
    • Rationalization of operations at the Baie-Comeau plant and implementation of recommandations ($1.7 M project yielding $35 M in yearly savings) ALCOA

    Kaïzen

    • Kaizen loading scrap MITTAL
    • Reduced spoilage KRUGER
  • Training

    Foremen school

    • Foremen school MINES WABUSH
    • Supervisor training at  N5 and at N4 to G2 HYDRO-QUÉBEC
    • Evaluation of the foremen’s management structure in the electrolysis department ABI
    • Management review of 32 supervisors MITTAL
    • Foremen school CASCADES

    Manager Improvment program

    • Implementation of a improved organisational structure to Shawinigan-Sud mechanical shop HYDRO-QUÉBEC
    • Evaluation of the foremen’s management structure in the electrolysis department ABI

    Dashboard management

    • To come...
  • Maintenance

    Implementation of a maintenance system

    • Fine tuning of awareness and site-meeting management tool at G2 HYDRO-QUÉBEC
    • Analysis and improvement of organizational effectiveness to achieve the required maintenance for an optimal HYDRO-QUÉBEC
    • Diagnosis maintenance and implementation of a system of maintenance management EXCELDOR

    Maintenance data analysis

    • Diagnosis maintenance and implementation of a system of maintenance management EXCELDOR
  • Management system

    Audit

    • ISO 9000 gap analysis ALCOA
    • ISO 14000 audit ABI

    Évaluation de fournisseurs

    • Supplier qualification support at G2 HYDRO-QUÉBEC

    Formation d'auditeurs

    • Quality coordinator and employees training ISO 9000 to Shawinigan-Sud mechanical shop HYDRO-QUÉBEC

    Implantation de système de gestion de la qualité

    • QS 9000 implementation NORSK-HYDRO
    • ISO 9000 implementation to Shawinigan-Sud mechanical shop HYDRO-QUÉBEC
    • ISO 9000 audits to Shawinigan-Sud mechanical shop HYDRO-QUÉBEC
    • ISO 9000 AND QS 9000 implementation ALCOA
  • Logistic

    Logistics process optimisation

    • Reorganization of G2 external store layout HYDRO-QUÉBEC
    • Warehouse reorganization of the store away HYDRO-QUÉBEC
    • Management of the gaps from inventory KRUGER
    • Development of logistics supply of the machine 9 CASCADES

    Logistics process improvement and development

    • To come...

    Logistics activites simulation

    • Simulation of global needs in rail logistics for the next 5 years IRON ORE